The Challenge

  • Take delivery of regolith from the bottom of the CSM Regolith Hopper
  • Transport the regolith horizontally over a distance of at least 5 meters
  • Optionally, transfer the regolith to the vertical transport system if this is separate from the horizontal system
  • Lift the regolith vertically to a height of at least 2.5 meters and deposit it in the receptacle of the CSM Molten Regolith Electrolysis Plant
  • Embedded rocks (up to 3.5 cm diameter) must be removed from the regolith
Our solution

What is our current progress?

Our Sponsors

Want to learn more about Spaceship EAC?

Click on the button to discover what we do!